Framework summary

TRL

Demonstrated maturity of the physical process configuration. Reported in the profile; not a role threshold.

DRL band

Band C → B → A: access, faithfulness, task fitness. R1 and R2 require Band B; R3 requires Band A.

α

Eight interface criteria scored 1–5. Thresholds apply to individual criteria; dimension means are descriptive only.

Role ceiling

Tested from the target role downwards: the highest role for which every applicable threshold is met.

View the assessment workflow (Figure 6) Assessment workflow: 1 assessment specification; 2 component readiness (TRL and DRL); 3 alignment scoring; 4 role test from the target role downwards against Table 5; 5 assessment output; 6 improvement and reassessment

Step 1 · Section 3.1, Table 3

Assessment specification

The specification fixes the system boundary, operating envelope, task and target role against which every score is interpreted. Readiness is not inferred beyond these conditions.

The integration role being assessed. Lower roles are tested only if the target is not supported.

Step 2 · Sections 3.2–3.3

Component readiness

TRL and DRL describe the physical process and the data independently of how they are connected, so they are assigned before alignment is scored.

2a

Technology Readiness Level

Assign TRL to the physical process configuration in the system boundary: what has been built and tested, at what scale, with which equipment and under which conditions.

2b

Data Readiness Level

Select the highest band fully achieved for the stated task (Table 4). Bands are hierarchical: Band A requires Bands B and C; Band B requires Band C.

Step 3 · Sections 3.4 and 4.2

Alignment scoring (α)

Score all eight criteria with an integer from 1 to 5 using the anchors. The R2 and R3 minimums shown on each criterion are the Table 5 thresholds.

Step 4 · Section 4.4, Table 5

Role-test conditions

αTD2 and αTD3 are always scored, but they enter the role test only when their conditions affect the task. αMT2 enters the R2 test only when R2 outputs include recommended actions; it is always required for R3.

Step 5 · Assessment output

TRL–DRL–α profile and role ceiling